SAAG, an oil and gas (O&G) engineering player, expects to know the outcome of its bid for contracts worth RM350mil in the next two months (Sept – Oct 2008).
The group would get the award result for a RM200mil project in India by end of this month (Aug 2008). The award result for a local contract worth RM150mil will be announced in October 2008. The contracts are for the servicing of platform rigs and drilling equipment in mostly O&G upstream activities.
Going forward … The group was preparing to tender for another Indian job worth RM300mil by year-end, also for similar services.
On its current RM700mil order book, the contracts would last until early 2012.
Major current contracts include the supply of work-over rigs, telecommunication towers, sewerage projects and the supply of tankers.
On its delayed Labuan Shipyard Engineering Sdn Bhd joint venture deal, it would be concluded in a month or two (Sept – Oct 2008). The delay was deliberate as they need time to re-evaluate the viability of the project, But, all the details have been ironed out and they are currently finalising the contracts with our Iran counterpart for the supply of rigs.
兴亡皆苦的零容错人生:为何我们迫切需要具有“亲知”的 AI?
-
在地球上人总是用身体的感官去瞭解每一吋土地和大海。在慢慢懂得制造工具和利用资源之后,才把移动轨迹变运和变快。人被局限于小记忆和身躯,传承学问很困难但科技进步可以解决这难题。
人的天性,令它不能接受别人比他更好,所以獵夺资源和擁有更多资源以滿足本身那充满缺陷的安全感。紛爭从几千年前至今,永恆不变。不说西方所谓的帝...
10 hours ago

1 comment:
Hi, just drop a line to see if you are interested to sign up for matched. co .uk.
The link is https://www.matched.co.uk/affiliate/6856481
They are interested to advertise in finanace blogs like ours.
Philip
Bursa KLSE Blogs and News
Post a Comment